Project name: Karun 4 Dam and Power Plant

image

Client:
Iran Water and Power Resources Development Company

Field of activity:
Dam

Location:
Chaharmahal and Bakhtiari Province

Contractors:
Energy and Water Resources Development Co.

Project Objectives:

Main objective of the project is to produce 250 MW electricity to the high voltage grid. Some other purposes such as river flow regulation and flood control will also be fulfilled.

Project components:

  • Main dam
  • Upstream Cofferdam
  • Downstream Cofferdam
  • Free spillway on the dam
  • 2 Orifice bottom outlets
  • 2 Diversion tunnels

Project Characteristics:

a. Main dam:

Type: double curvature concrete dam

Height: 230 m

Crest length: 440 m

Reservoir capacity: 2190 mcm

b. Upstream cofferdam:

Type: Earth fill with inclined clay core

Height: 45.5 m

c. Downstream cofferdam:

Type: Earth fill with vertical clay core

Height: 22 m

The role of Behan Sadd Company :

Behan Sadd Company was the technical consultant of the contractor for all grouting galleries and grout curtain.